Spirit 100 Meters From The Top
Pasadena CA (JPL) Aug 10, 2005 Spirit has been busy performing investigations with the tools on its robotic arm. It studied two targets on the rock dubbed "Bourgeoisie," and did a small bump to "Hausmann" to take some microscopic images. The plan was to drive away the next day, but the uplink did not happen correctly. The drive was replanned for Aug. 5 (sol 565). As of sol 564, Spirit is approximately 100 meters (328 feet) from the summit, and the rover will continue driving towards it.
Sol-by-sol summaries Sol 559 (July 29, 2005): Spirit continued Moessbauer spectrometer investigations on "Chic" (a target on the rock Bourgeoisie). Sol 560: Spirit took pictures with the microscopic imager, brushed with the rock abrasion tool, and performed an alpha particle X-ray spectrometer reading on "Gentil Matrice" (another target on Bourgeoisie). Sol 561: Spirit used the Moessbauer spectrometer on Gentil Matrice and did targeted remote sensing. Sol 562: Spirit finished its Moessbauer spectrometer investigations on Gentil Matrice, and drove to Hausmann (the rock next door). Sol 563: Spirit took pictures of Hausmann with the microscopic imager. A drive to "Assemblee" (the next target) was desired, but there was not enough time. A nap was required to keep rover internal temperatures below the allowable limit, so the drive was eliminated from the plan. Sol 564: The plan was for Spirit to drive a small "bump" to Assemblee. This plan did not make it to the rover. Before the communications uplink window started, the sweep into the low-gain antenna failed, and the Deep Space Network antenna did not lock up on the high-gain antenna until after all sequences were sent. The default science plan already onboard ran studies of the atmosphere with the panoramic camera. Sol 565 (Aug. 5, 2005): This sol's plan was a repeat of the plan for sol 564, and all commands were sent to Spirit twice. As of the beginning of its 565th sol on Mars, Spirit had driven 4,689 meters (2.91 miles). Community Email This Article Comment On This Article Related Links Mars Rovers at JPL Mars Rovers at Cornell SpaceDaily Search SpaceDaily Subscribe To SpaceDaily Express Mars News and Information at MarsDaily.com Lunar Dreams and more
Spirit Heading To 'Home Plate' Pasadena CA (JPL) Jan 09, 2006 Last week Spirit completed robotic-arm work on "El Dorado." The rover used all three of its spectrometers plus the microscopic imager for readings over the New Year's weekend. |
|
The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement |