Mars Exploration News  
MARSDAILY
Roscosmos postpones joint ESA ExoMars mission after failed parachute tests
by Staff Writers
Moscow (Sputnik) Aug 16, 2019

illustration only

Russian State Space Corporation Roscosmos said in a statement on Thursday that the launch of the joint Russian-European ExoMars-2020 astrobiology mission, aimed at searching for evidence of life on Mars, had been postponed after the recent failure of tests of the parachutes needed for the landing.

"The launch of the ExoMars-2020 mission is planned to take place during the 'astronomic window' from July 26-August 13, 2020, with landing on Mars scheduled for March 2021," Roscosmos said.

Meanwhile, Roscosmos chief Dmitry Rogozin has previously said that the joint mission of Roscosmos and the European Space Agency (ESA) will be launched on July 25, 2020.

A source told Sputnik last week that tests of the parachutes, developed in Europe, failed on August 5 in Sweden. The ESA confirmed the information, specifying that the parachute canopies had been damaged. New tests are expected to be held before 2019 end and also in 2020.

ExoMars Parachute Testing Continues
Paris (ESA) Aug 12 - As the second ExoMars mission, comprising a rover and surface science platform, progresses towards launch next year, teams continue to troubleshoot the parachute design following an unsuccessful high-altitude drop test last week.

The European-built Rosalind Franklin rover and the Russian-led surface platform, Kazachok, are nearing completion. They will be encapsulated in a descent module, and transported to Mars by a carrier module, following launch on a Proton rocket from Baikonur.

The descent module needs two parachutes - each with its own pilot chute for extraction - to help slow the craft prior to landing. Following separation of the parachutes, the speed must be suitable for the braking engines to safely deliver the landing platform and the rover onto the surface of Mars. The entire sequence from atmospheric entry to landing takes just six minutes.

As part of the planned testing prior to launch, several parachute tests were scheduled at the Swedish Space Corporation Esrange site. The first took place last year and demonstrated the successful deployment and inflation of the largest main parachute in a low-altitude drop test from 1.2 km, deployed by a helicopter. The parachute has a diameter of 35 m, which is the largest parachute ever to fly on a Mars mission.

On 28 May this year, the deployment sequence of all four parachutes was tested for the first time from a height of 29 km - released from a stratospheric helium balloon. While the deployment mechanisms activated correctly, and the overall sequence was completed, both main parachute canopies suffered damage.

Following hardware inspection, adaptations were implemented to the design of the parachutes and bags ready for the next high-altitude test, which was conducted on 5 August, this time just focusing on the larger, 35 m diameter, parachute.

Preliminary assessment shows that the initial steps were completed correctly, however damages to the canopy were observed prior to inflation, similar to the previous test. As a result, the test module descended under the drag of the pilot chute alone.

"It is disappointing that the precautionary design adaptations introduced following the anomalies of the last test have not helped us to pass the second test successfully, but as always we remain focused and are working to understand and correct the flaw in order to launch next year," says Francois Spoto, ESA's ExoMars Team Leader.

All hardware, videos and recorded telemetries have now been recovered and are currently under evaluation. The analysis should reveal the root cause of the anomaly and will be able to guide the way forward in terms of further modifications that might be required to the parachute system before subsequent test opportunities.

A further high-altitude test is already foreseen for the first main parachute before the end of this year. The next qualification attempt of the second main parachute is then anticipated for early 2020.

In parallel, the teams are investigating the possibility to manufacture additional parachute test models and conducting ground-based simulations to mimic the dynamic nature of parachute extraction, since there are not many opportunities for full-scale high-altitude drop tests.

Furthermore, in addition to the regular forum of exchanges between ESA and NASA experts, a workshop of Mars parachute specialists will convene next month to share knowledge.

"Getting to Mars and in particular landing on Mars is very difficult," adds Francois. "We are committed to flying a system that will safely deliver our payload to the surface of the Mars in order to conduct its unique science mission."

The mission is scheduled for launch in the window 25 July-13 August 2020, arriving at Mars in March 2021. After driving off the surface platform, Rosalind Franklin rover will explore the surface of Mars, seeking out geologically interesting sites to drill below the surface, to determine if life ever existed on our neighbour planet.

The rover is currently nearing completion at Airbus Defence and Space, Stevenage, UK, and will soon begin its environmental test campaign at Airbus Toulouse, France. At the same time, the flight carrier module comprising the descent module and lander platform will begin its final round of testing at Thales Alenia Space, Cannes, France. The rover will be integrated into the spacecraft in early 2020.

The ExoMars programme is a joint endeavour between ESA and Roscosmos. In addition to the 2020 mission, it also includes the Trace Gas Orbiter (TGO) launched in 2016. The TGO is already both delivering important scientific results of its own and relaying data from NASA's Curiosity Mars rover and Insight lander. It will also relay the data from the 2020 mission once it arrives at Mars in March 2021.


Related Links
ExoMars-2020
Mars News and Information at MarsDaily.com
Lunar Dreams and more


Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.
SpaceDaily Contributor
$5 Billed Once


credit card or paypal
SpaceDaily Monthly Supporter
$5 Billed Monthly


paypal only


MARSDAILY
Europe prepares for Mars courier
Paris (ESA) Jul 26, 2019
The first round-trip to the Red Planet will see a European orbiter bringing martian samples back to Earth. ESA is opening the door to industry to build the spacecraft that will deliver the precious rocks, dust and gas from Mars - the key to understanding whether life ever existed on our closest planetary neighbour. This 'take-away' service is called the Earth Return Orbiter, and will be ESA's major contribution to the Mars Sample Return campaign. The ESA Orbiter will carry NASA's Capture and Conta ... read more

Comment using your Disqus, Facebook, Google or Twitter login.



Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle

MARSDAILY
Chandrayaan-2 enters Lunar Transfer Trajectory

India's moon-bound Chandrayaan-2 spacecraft set to leave Earth's orbit

Kilopower technology could be used for lunar night operations

China's lunar rover travels 271 meters on moon's far side

MARSDAILY
China launches first private rocket capable of carrying satellites

Chinese scientists say goodbye to Tiangong-2

China's space lab Tiangong 2 destroyed in controlled fall to earth

From Moon to Mars, Chinese space engineers rise to new challenges

MARSDAILY
Critical Observation Made on During First Night of Return to Operations

Four Candidate Sites Selected for Asteroid Sample Collection

Largest impact crater in the US, buried for 35 million years

Asteroid's features to be named after mythical birds

MARSDAILY
Hubble showcases new portrait of Jupiter

Giant Impact Disrupted Jupiter's Core

Young Jupiter Was Smacked Head-On by Massive Newborn Planet

Jupiter's auroras powered by alternating current

MARSDAILY
A brief astronomical history of Saturn's amazing rings

Yale researcher has a window seat for planning NASA's Dragonfly mission

SMU's 'Titans in a jar' could answer key questions ahead of NASA's space exploration

The mission of a lifetime: a drone on Titan in 2034

MARSDAILY
Using lasers to visualize molecular mysteries in our atmosphere

Making microbes that transform greenhouse gases

Making sense of remote sensing data

NASA's Spacecraft Atmosphere Monitor Goes to Work Aboard the International Space Station

MARSDAILY
Xplore To Send Celestis Memorials to the Moon, and Beyond

India orders Russian equipment for first manned space mission

The first DJ in space

Solar sail craft could revolutionize space travel

MARSDAILY
NASA plans for Webb to zero in on TRAPPIST-1 atmospheres within a year of launch

Timeline suggests 'giant planet migration' was earlier than predicted

How astronomers chase new worlds in TESS data

How Many Earth-like Planets Are Around Sun-like Stars









The content herein, unless otherwise known to be public domain, are Copyright 1995-2024 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. All articles labeled "by Staff Writers" include reports supplied to Space Media Network by industry news wires, PR agencies, corporate press officers and the like. Such articles are individually curated and edited by Space Media Network staff on the basis of the report's information value to our industry and professional readership. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. General Data Protection Regulation (GDPR) Statement Our advertisers use various cookies and the like to deliver the best ad banner available at one time. All network advertising suppliers have GDPR policies (Legitimate Interest) that conform with EU regulations for data collection. By using our websites you consent to cookie based advertising. If you do not agree with this then you must stop using the websites from May 25, 2018. Privacy Statement. Additional information can be found here at About Us.