Pasadena (JPL) Jul 18, 2005
Opportunity made impressive progress toward "Erebus Crater" during the week. Four sols of driving totaled 57 meters (187 feet), while slipping less than 10 percent on each drive. A longer drive was plotted for the fifth day.

The rover has continued to drive down ripple troughs. We have a series of checks in place to prevent excessive bogging down, including, tilt, roll, pitch limit checks, current checks and slip checks (set at 40 percent slip).

We look forward to more progress south over the coming week.

Sol-by-sol summaries:

Sol 518 and 519 (July 9 and July 10, 2005): In light of extensive driving and data collection the previous week, these sols were designed to conduct light remote sensing, recharge batteries, and downlink data to free up memory space on the rover.

Sol 520: The uplink team designed a 16-meter (52-foot) drive. Opportunity completed 10.34 meters (33.92 feet) of the drive before tripping a mobility-goal error. There was a bad position estimate given to the onboard slip-checking software, so it incorrectly thought the rover was 0.5 to 1 meters (1.6 to 3.3 feet) back from its actual position, thus making insufficient progress because it thought it was slipping excessively. However, analysis by the mobility team on the ground determined the true slip, and we were "go" to drive the following sol.

Sol 521: Opportunity completed a successful drive of 15.2 meters (about 50 feet) without any faults.

Sol 522: The rover completed another successful drive of 15 meters (49 feet), with only 6.4 percent reported slip.

Sol 523: We drove 16.2 meters (53 feet) of a planned 20-meter (66-foot) drive. The drive stopped short because onboard slip-checking software was having difficulty tracking the rover's rear wheel tracks, which are used as a reference point to monitor the slip. Opportunity does not want to keep trying to drive if it is unsure of how much it is slipping, so the team sets a limit to this failure count. This prevents bogging down in the terrain.

Sol 524 (July 15):

The uplink team planned a drive of 27 meters (89 feet). The drive plan is the first in Opportunity's current terrain using a combination of short segments of blind driving followed by shorter segments (40 centimeters, or 16 inches) of slip-check driving. This drive strategy is designed to allow us to drive farther by using a less time-consuming drive option while still verifying every 5 meters that we are not bogging down.

Odometry total after sol 523 drive: 5464.09 meters (3.39 miles).

Community
Email This Article
Comment On This Article

Related Links
Mars Rovers at JPL
Mars Rovers at Cornell
SpaceDaily
Search SpaceDaily
Subscribe To SpaceDaily Express
Mars News and Information at MarsDaily.com
Lunar Dreams and more



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Spirit Heading To 'Home Plate'
Pasadena CA (JPL) Jan 09, 2006
Last week Spirit completed robotic-arm work on "El Dorado." The rover used all three of its spectrometers plus the microscopic imager for readings over the New Year's weekend.









  • NASA plans to send new robot to Jupiter
  • Los Alamos Hopes To Lead New Era Of Nuclear Space Tranportion With Jovian Mission
  • Boeing Selects Leader for Nuclear Space Systems Program
  • Boeing-Led Team to Study Nuclear-Powered Space Systems

  • A Giant Leap Towards The Moon
  • Spacedev Microsat To Travel Interplanetary Superhighway To The Moon
  • Abandoned Spaceships
  • Enabling Technologies Showcase at RTTM IV Seeks Lunar Entrepreneurs

  • Russian Space Agency To Launch Kliper Project
  • Spachab Advances Space Commerce; New Multipurpose Spacecraft in Development
  • Russia Approves A 10-Year Space Budget
  • Catch Mechanism For Future Space Tether Demonstrated

  • Pluto Bound Spacecraft Shipped To Goddard For Pre-launch Tests
  • Planners Eye Next Stage Of New Horizons Pluto Mission
  • Preperation For Mission To Pluto And Beyond Continues
  • Ball Aerospace Delivers Imaging Instrument For NASA's Mission To Pluto

  • NASA Selects New Frontiers Mission Concept Study
  • Icy Jupiter Moon Throws A Curve Ball At Formation Theories
  • Jupiter: A Cloudy Mirror For The Sun?
  • Chandra Probes High-Voltage Auroras On Jupiter



  • Titan's Big Smile
  • Clues In The Bright And Dark
  • Spongy-Looking Hyperion Tumbles Into View
  • Nasa's Cassini Reveals Lake-Like Feature On Titan

  • Shark Skin Saves Naval Industry Money
  • Supercomputer Installed At RIT Among The World's Fastest
  • SwRI Continues Providing Spacecraft Avionics For Deep Impact Mission
  • NASA Funds Space Communication Testbed Project for Comsat Laboratories

  • The content herein, unless otherwise known to be public domain, are Copyright 1995-2006 - SpaceDaily.AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA PortalReports are copyright European Space Agency. All NASA sourced material is public domain. Additionalcopyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement